Project Background
Collaborating with Balai Besar Bahan dan Barang Teknik (B4T) Bandung, 3S Engineering embarked on a project addressing the challenge of assessing the feasibility and remaining lifespan of a 37-year-old Waste Heat Boiler (WHB).

Methodology and Approach
Our multidisciplinary approach encompassed material science, measurement, vibration analysis, fracture mechanics, and numerical methods. Leveraging various technologies, including in-situ metallography, hardness testing, visual inspection, Non-Destructive Testing (NDT), computational fluid dynamics (CFD) via ANSYS, and finite element analysis (ABAQUS), ensured a comprehensive analysis.

Challenges
The project faced challenges in synchronizing activities across diverse fields. The need for a cohesive team with uniform expertise and speed was crucial. Overcoming this required meticulous planning, intensive communication, and strong leadership under tight deadlines.

Outcome
The project achieved significant outcomes:

  1. Operational Viability of WHB:
    • Assurance of the WHB’s operational viability.
    • Extension of its lifespan by 10 years beyond design limits.
  2. Recommendation for Periodic Inspections:
    • Proposal for periodic inspections every 1.5 years.
    • Ensured ongoing operational stability for the client.
  3. Strategic Planning and Resource Utilization:
    • Allowing the client to defer new boiler investments.
    • Strategic planning for future replacements.

This collaboration underscored our ability to harmonize diverse expertise effectively, offering solutions that reinforce industrial equipment longevity and optimize resource utilization.

 

Written by

Endra Sujatmika

Endra Sujatmika

Finite Element Analysis Engineer